开云在线官方

网站公告:

新闻中心

开云在线官方(中国)有限公司官网

电话:0531-69951198

邮箱:jingtuolt@163.com

传真:0531-69951198

地址:济南市历城区祝甸北路2号院

网址://keonnected.com

企业动态

当前位置:首页 - 新闻中心 - 企业动态 - 气体增压泵厂家介绍锅炉水

气体增压泵厂家介绍锅炉水压试验注意事项

发布时间:2019-03-26 10:48:10   发布人://keonnected.com
  没有水压试验压力容器、锅炉、和其他产品的安全使用具有重要意义,锅炉水压试验后没有直接操作不仅会对锅炉产生损害也可能威胁到人们的生命安全,下面是zalman,锅炉水压试验测试测试步骤和分析。
  It is of great significance to use the pressure vessel, boiler and other products safely without hydrostatic test. No direct operation after hydrostatic test of boiler will not only damage the boiler, but also threaten people's life safety. The following is Zalman, the steps and analysis of hydrostatic test of boiler.
  锅炉压力管和管配件、阀门已经完成根据图纸,规范和符合设计要求,锅炉压力测试临时管道和排气管道安装和连接和水压试验泵和蒸汽鼓内部检查,了解锅炉的容器,水压试验,水压试验的接口的连接模式。
  Boiler pressure pipes, pipe fittings and valves have been completed according to the drawings, specifications and design requirements. Installation and connection of temporary pipes and exhaust pipes for boiler pressure test and internal inspection of water pressure test pump and steam drum have been completed to understand the connection mode of boiler vessels, water pressure test and water pressure test joints.
气体增压泵
  用于压力试验的压力表已经过检定,在每周检定期间,压力表的全量程值应是被试压力的1.5~2倍,其精度不应低于1.5级。试压泵前在两个地方安装临时管线和集汽器。土建厂房已关闭,锅炉厂已升温,环境温度已高于5℃,锅炉柱脚已注浆,强度已达到设计强度的70%,合金钢管谱分析数据完整。
  The pressure gauge used for pressure test has been verified. During weekly verification, the full range value of the pressure gauge shall be 1.5-2 times of the tested pressure, and its accuracy shall not be lower than level 1.5. Install temporary pipeline and steam collector in two places before pressure test pump. The civil engineering plant has been closed, the boiler plant has been heated up, the ambient temperature has been higher than 5 ℃, the boiler plinth has been grouted, the strength has reached 70% of the design strength, and the alloy steel pipe spectrum analysis data is complete.
  对需要进行热处理的管道进行了热处理,对静水试验前的数据进行了检测,并通知市质量技术监督局到现场进行检测,参与静水试验。因此,锅炉水压检测是一个严格的过程,这是必不可少的。
  The pipes that need to be heat treated are heat treated, the data before the hydrostatic test are tested, and the Municipal Bureau of quality and technical supervision is informed to go to the site for testing and participate in the hydrostatic test. Therefore, the boiler water pressure detection is a strict process, which is essential.
  以上是气体增压泵厂家为大家介绍的相关内容,想要了解更多内容,欢迎访问网站://keonnected.comThe above is the relevant content introduced by the gas booster pump manufacturer. For more information, please visit the website: //keonnected.com

新闻推荐:
空气增压泵的使用优势大揭秘! 2022-07-05
气体增压泵的生产要注意哪些环节? 2022-06-27
选择气动增压泵要从哪些方面考虑? 2022-06-19
大流量气体增压系统的使用特点 2022-06-10
气体增压泵一直被长期使用的原因? 2022-06-02
气体增压泵和液体增压泵有什么区别? 2022-05-27
气体增压泵能取代传统的机械泵、液压泵 2022-05-15
增压泵的安装必要事项! 2022-05-10
增压泵的使用维护非常简单! 2022-04-28
气体增压泵的使用方法及注意事项: 2022-04-20

13188935873